Projects

PALMALOFT

TESTIMONIALS

What People Are Saying

Onboard High Power III, we are extremely satisfied with the professional service of Palma Loft. Their friendly team is responding perfectly to our specific needs which include complex rigging services, classification load testing, hardware, and line supplies. They perform at the highest and modern safety standards we have seen in the industry. Fast response times, structured, good business etiquette! I can therefore highly recommend Palma Loft as a long-term service provider.

HIGHPOWER III

Rossinavi - 70m.

Palma Loft has always provided a professional, safe service for all our load testing and servicing on board. They come up with safe solutions when things get tricky and they always conduct their tests with the safety of the crew, themselves, and the vessel as a priority. Lots of thought comes from their team when applying their skill set. I highly recommend them to any vessel looking for a professional, reliable, and honest company that requires their unique skill set.

MY ALICIA

Defoe Shipbuilding Co. - 47m.

“We used Palma Loft for removing and hanging our stern doors for painting and again when replacing the replacing the bearings on the hydraulic rams that operate the doors. Both times Ben and his team did an excellent job. Came assessed the job, scheduled it, left time for the unexpected which is inevitable when opening up something for the first time in 5 years. But with their knowledge and experience everything went smoothly and on time. Very easy to work with. I would highly recommend them.

SY BLUE PAPILLON

Royal Huisman - 43m.

PROJECTS

Palmaloft

BLUE PAPILLON

HEAVY LIFTING

30-meter Sailing Yacht Blue papillon built by Royal Huisman was in Palma de Mallorca for their 5th yearly survey/refit 2020. Palmaloft completed multiple heavy lifts as removal of the transom door including the steps. Anchor cassete & multiple other lifting jobs.

ETHEREAL

VARIOUS WORKS

58-meter Sailing Yacht Ethereal built by Royal Huisman was in Palma de Mallorca for their annual yearly survey/refit late in 2020 and mid-2021. During this time, Palmaloft completed multiple heavy lifts, works included were removal all satellite domes from main and mizzen masts, main boom vang and main boarding gangway for service and repair. We also carried out a rig inspection on both masts prior their departure to the caribean.

SY AURORA M

RIGGING

Oyster 65. The rig was pulled for the 8 year rod rigging service. Reckmann furlers serviced and all hardware was fully inspected & service.

SY MATHILDA SOUND

RIGGING

Oyster 82. The rig was pulled for the 8 year rod rigging service. Reckmann furlers serviced and all hardware was fully inspected & serviced.

SY NADEDJA

RIGGING

Shipmen 70. The rig was pulled to carried out a mast head carbon repair. ECsix carbon rigging was visually inspected. Hardware was inspected & serviced.

TWIZZLE

VARIOUS WORKS

188 feet Sailing Yacht built Twizzle by Royal Huisman was in Palma de Mallorca for their 5th yearly survey, they carried out their lifting survey with us during this period 2020/2021.  Works Included load testing Port and Starboard side boarding and swim platforms, aft boarding gangway and Side boarding stairways. The loose lifting survey was caried out on the working aloft gear, lifting accessories and engine room anchors. The forward crane was tested in accordance with the MSC 402 regulations to complete this successful lifting survey.

This website uses cookies to give you the best user experience. If you continue browsing you are giving your consent to the acceptance of the aforementioned cookies and the acceptance of our cookie policy , click on the link for more information.plugin cookies

ACEPTAR
Aviso de cookies